— Installed. Verified. Documented.

Reference work across African climates and sectors

Each project below was measured before design, commissioned with full thermal load verification, and delivered on-site — coastal, arid, and high-altitude conditions included.

Close-up of industrial chiller plant pipework and insulated vessels inside a large manufacturing facility, ambient tungsten light mixing with daylight through a high clerestory, condensation visible on pipe surfaces
Close-up of industrial chiller plant pipework and insulated vessels inside a large manufacturing facility, ambient tungsten light mixing with daylight through a high clerestory, condensation visible on pipe surfaces
Wide shot of rooftop air handling units on a commercial office building in Dakar, humid coastal haze softening the background, steel mounting frames and ductwork penetrations clearly visible, overcast industrial daylight
Wide shot of rooftop air handling units on a commercial office building in Dakar, humid coastal haze softening the background, steel mounting frames and ductwork penetrations clearly visible, overcast industrial daylight
Thermal imaging scan overlaid on an institutional building envelope in a high-altitude Moroccan city, false-color heat map revealing insulation gaps at window frames, surveyor's equipment visible at the lower left corner
Thermal imaging scan overlaid on an institutional building envelope in a high-altitude Moroccan city, false-color heat map revealing insulation gaps at window frames, surveyor's equipment visible at the lower left corner
/ Selected installations

Industrial, commercial, and institutional sites

Industrial — Casablanca
Commercial — Dakar
Institutional — Marrakech region

Process cooling, textile plant

HVAC retrofit, office tower

Envelope diagnostics, hospital wing

Full thermal load audit, chiller plant redesign, and post-commissioning verification. Peak load reduced 28% against measured baseline.

Site-specific psychrometric analysis for coastal humidity. Zoned air handling system installed and verified across six occupied floors.

Thermal imaging survey and remediation design for a 4,200 m² wing. Cooling demand cut 19% after envelope corrections were installed.

Have a site that needs measuring first?

Bring us the site conditions and the problem. We will run the numbers before we propose anything.